ANALISIS EFEKTIVITAS MESIN PRODUKSI PULSE TUBE FILTER PADA PROSES PENGOLAHAN FATTY ACID HYDROGENATION DENGAN MENGGUNAKAN METODE OVERAL EQUIPMENT EFFECTIVENESS (OEE)
Abstract
Research has been carried out on the causes of failure of pulse tube filter production machines). The six big losses factor that has the greatest percentage of influence on losses time and needs to be repaired at reduced speed losses is equal to 41.66%, idling/minor stopage losses of 25.14% means the low performance efficiency of the pulse tube filter machine is caused by high failure that occurs thus affecting the level of effectiveness of the machine.
References
[2] Fahmi, Afif . Rahman, Efranto (2012).Implementasi total Productive Maintenance Sebagai Penunjang Produktivitas Dengan Pengukuran Overal Equipment Effectiveness Pada Mesin Rotary KTH-8[jurnal]. Malang: Universitas Brawijaya.
[3] Hermanto, (2016). Pengukuran Nilai Overal Equipment Effectiveness Pada Divisi Painting di PT.AIM,Jurnal Metris,17 (2016)
[4] Nursanti,Ida dan Susanto,Yoko(2014), Analisis Perhitungan Overal Equipment Effectiveness Pada Mesin Packing Untuk Meningkatkan Nilai Availability Mesin,Jurnal Ilmiah Teknik industri vol.13 no 1 (2014).
[5] Nakajima,(1988) Introduction to total productive Maintenance (TPM).Cambridge;Produktivity press
[6] Roberts,J.(1997) Total Productive Maintenance (TPM) The Technology interface.Texas:A&M University
[7] Rozaq,Mohammad Isniani. (2015) Implementasi Total Productive Maintenance (TPM) Dalam Penerapan Operal Equipment Efectiveness (OEE) di PT.Adi Satria Abadi,Jurnal OPSI (Optimasi Sistem Industri) Yogyakarta:Universitas Pembangunan Nasional Veteran.
[8] Suliantoro,H.,N.,Prastawa,H.,Sihombing, I.,& M, Anita. (2016) .Penerapan Metode Overall Equipment Effectiveness (OEE) Dan Fault Tree Analysis (FTA) Untuk Mengukur Efektifitas Mesin Reng. jurnal Teknik Industri Undip,vol 12,No 2
[9] Tague,N.(2005)The quality toolbox.United States of america:ASQ.
[10] Triwardani, Dinda Hesti dkk (2012). Analysis Overall Equipment effectiveness (OEE) Dalam Meminimalisasi Six Big Loss Pada Mesin Produksi Dual Filter DD07 di PT.Filtrona Indonesia ,Surabaya. Jurnal Teknik Industri Universitas Brawijaya.
[11] Wijaya,C,Y.,& Widyadana ,I,A(2015). Pengukuran Overall Equipment Effectiveness (OEE) di PT.Astra Otopart Tbk,Divisi Adiwira Plastic. Jurnal Titra vol 3,41-48.
[12] Wireman,T.(2004) Total ProductiveMaintenance,2nd ed.Newyork industrial press